点击这里给我发消息 感谢您的光临! 点击这里给我发消息

直拨热线
027-87329910
027-87329980
027-87329937
 
TODAY:
Product
The contractor projects of petrochemical industry
The design and manufacture of pressure containers
The design and manufacture of marine transportation system
The design and consult of oil depot and gas station
The design and manufacture of oil vapour recovery system
Noise reduction and sound absorbing equipment
Accessories of oil tank
Accessories of pipe
Equipment of gas station
Fine filter
Quick coupling
Your location:Product >> Accessories of oil tank
Train crane tube
Date: 2009-8-8                 Click: 2665

 

1. Executive standards:

Products are in line with the API650 standard, specification for the design of tank and petrochemical SYJ1060 vertical cylindrical steel tank design technical requirements and HG/T21608 standard welding SH3046-92 Petrochemical vertical cylindrical steel. GB / T6892 and GB / T5237 standards with aluminum alloy material; GB / T5547 standard character of rubber material.

2. Train crane tube

1) Application:Suitable for train tanker unloading is provided, all kinds of fuel oil, lubricating oil, edible oil, crude oil, heavy oil and chemical industry and other industries, all kinds of chemical liquid materials.

2) Type: HH100

3) Material of product:Low carbon steel, stainless steel, aluminium alloy and so on.

4)Sealing material:Oil resistant butadiene acrylonitrile rubber, fluorine rubber

5)Installation Notes:

1, the Zhanqiao and the crane pipe connections should be equipped with the standard flange corresponding with the crane pipe, flange from rail surface height of 3.7 ~ 4 meters.

2, the assembly, reference shall be made to the working drawing, from basic rotary device to the vertical tubes, bottom-up sequentially arranged, finally installing balancer.

3, install the balancer, the oil arm up to about 60 °, the balance on both sides of the pin into the hook, and then the binaural balancer end of the draw rod alignment lifting rotary actuator enclosure of single ear, mount pin shaft, and then loaded onto a cotter pin.

4, adjust the balance of force, the oil is arranged in a horizontal state, unscrew the rear end cover of the balancer, visible adjusting screw. Such as crane tube have the freedom to decline, then using the socket wrench, tighten the screw, such as crane tube free rising trend, loosen the screw, until the crane loading arm at -5 ° ~ 60 ° range stops.

5, the installation should take necessary safety measures in the process

6) Use and maintain:

1, traction crane tube alignment, applied force uniform, avoid impact.

2, when the operation is completed, the crane tube back to Zhanqiao is fixed, in order to avoid accidents, and the loading arm to about 60 ° position, using balancer in the relaxed state.

7) Technical parameters:

 


1、Nominal diameter:DN100-150mm

2、Working range:Maximum turning radius:4600mm   Minimum turning radius:3000mm

3、Angular of long arm:upper 60℃,lower -15℃

4、Working pressure:0.4MPa

5、Material:carbon steel, stainless steel, Lining anti acid and so on.

 

8) Drawings:

1. the turning device. 2. short tube. 3. The middle rotary device 4. Lifting and turning device. 5.balancer. 6. long arm 7. vertical tube

9) The design drawing of crane tube:

 

 

All rights reserved: Wuhan Zhongheng Environment-friendly Energy-saving Project Co., Ltd Technical assistance: EIMM
Copyright(c) 2019 All rights reservedYou are the 1360773th visitor.
National sales telephone:+86-27-87329980Fax: +86-27-87260685Email: whzhhb66@vip.163.com No.:06004582