1, oil station and the crane pipe connection with the corresponding standard flange, and ensure the reliable base flange, flange is apart from the ground height of 2.1 to 2.2 meters, the crane lifting flange height from the ground to 2.7 ~ 2.8 meters.
2, the factory has sealing test, the user installed only when schematic reference structure, the first level short tube and the oil rig base flange connection, and then connected with the horizontal tube and a lifting arm group, finally connecting rod installing balancer.
3, after the completion of the balancer assembly, adjustment, the lifting arm up to about 60 degrees above the tail cap and unscrew the balancer, the adjusting screw to crane tube at -15 ° ~ 60 ° range can stop to.
6) Use and maintain:
1, traction crane tube, using force uniform, avoid impact.
2, when the operation is completed, the crane tube side to push the oil rig, and the crane lifting arm position of 60 DEG, the balancer in the relaxed state.
3, the user should establish and improve the repair maintenance system, often check the crane pipe work, maintenance work.
7) Technical parameters:
1、Nominal diameter:DN80-100mm
2、Working range:Maximum turning radius:2600mm Minimum turning radius:1400mm
3、Angular of long arm:upper 60℃,lower -30℃
4、Working pressure:0.6MPa
5、Material:carbon steel, stainless steel, Lining anti acid and so on.
8) Drawings:
1. the short arm turning device. 2. elbow turning device. 3. stabilizer. 4. adjusting nut. 5. long arm. 6. vertical tube